Dear Telegraph Landers, There is a lot going on at Telegraph Landing which may not be apparent as you come and go. Planning For a Sound Physical Plant Telegraph Landing is nearly 30
years old, and we need to thoroughly evaluate the physical plant, analyze our
repair and replacement needs, and create a sound financial plan. Treasurer In the last few weeks, The Helsing Group delivered a draft of its independent reserve study, which we get every three years. This reserve study is an analysis, year by year over the next thirty years, anticipating Telegraph Landing’s long-term financial needs for capital projects, such as painting, roofing, elevators, boilers, intercom system, carpets, lighting, garage, and dozens of other categories. Once all questions about the draft study have been clarified and answered, the completed study will guide the Finance Committee in the next few months as it develops recommendations to the Board on how to plan financially for our long-term capital needs. We need to plan so that we have enough monies reserved to pay for each element’s replacement or maintenance when the time comes. When the Finance Committee’s recommendations are presented, the directors and homeowners will be able to discuss how to best plan financially to maintain our facility. I hope you will join with me in thanking Barry and Mort for their efforts over these past many months and in thanking the Finance Committee members for their anticipated hard work over the next several months as we address, as a community, our capital projects and financial planning issues. Building #1 Windows KC Glass proposed a creative and
cost-effective repair for the seven homeowners with serious window leaks in
Building #1. The work was completed in
October, and no serious leaks have been reported -- even after the heavy rains
in the second week of November. The KC
solution, removing the vertical window systems and installing new sill
flashing, cost TL approximately $40,000.
Last May, the Board thought it had only one option, totally replacing
all windows and frames, with significant engineering, material, and labor
costs. The informal cost estimates were
in the hundreds of thousands of dollars.
Based upon suggestions of Director The Townhouse Roofs In May 2004, the new Board (four newly elected members) had to decide whether to proceed with waterproofing all the townhouse roofs and decks (i.e. balconies) at a cost of approximately $1,000,000. The previous Board had selected Ferrari Moe to be the engineering firm for that project although it had not authorized Ferrari Moe to develop the detailed drawings. No contractor had been asked to bid on the project. We were told that we had to approve the project immediately, or face the impossibility of finishing the repairs before the beginning of the rainy season. There had been for many months substantial contention whether it was truly necessary re-do all of the surfaces, whether the insurance limitation in Ferrari Moe’s contract was appropriate given a project of this size, and whether dry rot or other problems requiring additional work might be found once the project was under way. Additional repairs would increase the cost and delay project completion. With input from a variety of experts (hours of meetings with experts and analysis by directors Barry, Mort and Faye), the Board decided on a limited project for the summer of 2004: to fix and resurface just the six balconies and roofs with reported leaks and the mechanical roofs (the four roofs above the four elevators shafts in the townhouse buildings). We limited the project so we could be assured of finishing and so we could be more knowledgeable when we plan the rest of the resurfacing. We want to be able to anticipate the likely problems, plan an appropriate approach, and avoid doing unnecessary work, Director I am pleased to report that the work for 2004 is nearly complete at a cost of approximately $250,000, including the related engineering expenses. Significant dry rot was found and repaired in these limited areas. We also learned of many improper construction techniques from thirty-years ago, such as the failure to cap the parapet walls, and install proper flashing. These defects have caused, or may in the future cause, water damage and dry rot. After some serious November rains, we tested the nearly completed work and concluded it had not been harmed. We look forward to finishing the project in early December. Throughout the summer and fall,
directors Engineering Needs One of the lessons we have already learned from the townhouse roof project is that we need to have engineering advice to properly maintain our physical plant and prioritize repairs and replacement. This winter the Board will decide on an engineering firm for Telegraph Landing to work with and rely on for our engineering needs for the coming years. I understand from Barry and Mort that we have three engineering firms to choose from. Barry and Mort have started interviewing those firms. At a future Board meeting, the relative merits of the three candidate firms will be discussed by the Board, with homeowner input. We look forward to making this important decision after a full and open discussion. Re-valving in the High Rise Buildings The thirty year-old water supply
system to Buildings #1 and #2 was failing as this Board took office in
May. A simple plumbing repair in one
unit could require the shut-off of the entire building or major parts of the
building because the antiquated valves were no longer holding. After considerable analysis by the Board from
reports and information supplied by our property manager Electrical Testing To Avoid Dangerous Conditions Previous Boards have addressed
and fixed a potentially serious problem of electrical arcing in Buildings #1
and #2 caused by resistive connections between the main bus lines and wiring to
individual units. The risk, if not
fixed, is electrical fire. When this
Board started in May, we were told that a potential for arcing existed in the
townhouse electrical panels. Every three
years, TL engages an electrical contractor to test and report on arcing in
these electrical panels. Dynaelectric’s
recent report gave them a clean bill of health.
At the October meeting, director Financial Analysis of Operating Expenses The Finance Committee ( One of their focuses has been on
garbage. We pay $100 per bin for garbage pick-up and we pay nothing for
recyclables pick-up. I hope you have
read the new recycling literature that is posted and was circulated in the past
few weeks. You can now put all of your
recyclables, cans, paper, and plastics, together. If you put your recyclables in any of our
recycling bins, and not in the regular garbage bins, you will be shifting from
an expensive to a free service. The TL
recycling effort is already receiving much support. I was at the front desk one morning during
the third week of November at around Another focus is a reduction of expenses for landscaping of about $10,000 per year. These discussions are still underway. Analysis of Service Contracts The Finance Committee has also analyzed a major component of expenses, janitorial services. Our janitorial service provider, Genesis Building Services, employs the janitors who do the cleaning here at TL. The Finance Committee learned during the summer that there was another janitorial company with excellent service references which could provide the same level, or possibly even better, janitorial services at a significant savings, some $67,000, per year. At the November meeting, the Finance Committee and the Board had anticipated that there would be a discussion of the advantages of using each janitorial company, deferring until the next meeting any decision. However, only a few days before the November Board meeting, in response to several recent meetings with Barry and Mort, Genesis said it could cut our expenses by more than $25,000 per year and improve services significantly. This new development was discussed at the November meeting. The Board has tabled the discussion for six months, to see if Genesis can satisfy both our financial and performance needs. Property Manager Performance Appraisal The Board will soon be doing a
performance appraisal for our property manager, Committees Doing Important and Needed Work Everyone has seen the beautiful
work done by the House Committee in decorating our common areas for Halloween
and Thanksgiving, as well as outfitting our Club Room with books and videos for
our lending library. The House Committee
has also planned the Holiday Faire & Auction to be held on December 3 and
the Holiday Party on December 19. I
hope to see you at one or both of these events.
Beginning on December 1, all décor on all lobby tables will be
removed. They will be re-decorated by
the House Committee for the winter holidays.
Please express your thanks and appreciation to House Committee Chair Margaret
Miller for marshalling all of the wonderful House Committee projects that have
made TL a warmer, friendlier and more convivial place to live. She has been ably supported by House
Committee members Mary Slusher, Julie Baker, I also hope you are aware of the
terrific job by the Landscape Committee, chaired by The Rules Committee ( The Security & Maintenance Committee, chaired by Al Dockus, with the assistance of director Mort Beebe, made a proposal to the Board for additional security equipment around Telegraph Landing, which the Board approved at the October meeting. This equipment will be installed shortly and we will have increased electronic surveillance capabilities. Jerry Adams, Frieda Weiner, Suzette Donch, and John Bain have also contributed to the work of this committee. The Emergency Preparedness Committee was created at the October meeting and will be chaired by Laura Davidson. We look forward to thoughtful recommendations in the near future for how TL residents and the Association will address the possibility of earthquake, fire, and terrorism emergencies. It Shouldn’t Be a Thankless Job We are making great strides in improving our facilities and performing sound financial planning. Our committees are making Telegraph Landing a vibrant, member-oriented community. We are very fortunate to have so many devoted, community-minded volunteers. None of the people mentioned in this letter, with the exception of our property manager, receive any compensation for all these hundreds of hours of efforts. I hope you will express your thanks and appreciation to each of them and convey your respect for their hard work and good intentions. We are building a better Telegraph Landing, together. Wishing you a joyous holiday season and a healthy and happy new year.
|